01/02/2016

RENOVATION OF THE CIRCULATING SYSTEM FOR THE MAGALINI HOSPITAL

THE REQUEST: MODERNISATION OF PUMPS FOR THE HEATING PLANT AND WASTE WATERS

The project considered work both for the climate control circulation system and for cold water, installing various CM, KLP, NKM-G and KDN pumps and a 3-pump inverter unit. The waste water management system was also revised, with 4 FEKA 8000 and 2 Feka 6000.

TAB OSP MAGALINI